This picture shows what is almost never seen: the heater before render. The mass is built entirely in firebricks, including the rounded section that wraps around the firebox — every brick in the curve is cut to suit.
The site-built bench is already in place on the left, capped with its slab. The glazed firebox is wedged in position, protected by its timber packers. Only the render is missing.
Built in 2013.


